Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Independent TV

Showing now | News

Video Player Placeholder
Moment power station chimneys crumble to ground in blast

01:22

Moment 800-foot-tall power station chimney crumbles to ground in blast

The 800 and 500-foot-tall chimneys of an old coal-fired power station in Tennessee have been demolished in a controlled explosion.

The Tennessee Valley Authority (TVA) released footage of the planned blast at the Bull Run Fossil Plant on Saturday (28 June).

Video shows a huge explosion, followed by a loud bang, before one of the chimneys topples in a massive cloud of smoke and crumbles to the ground.

“Demolition experts safely imploded the 500-foot and 800-foot stacks at the retired Bull Run Fossil Plant,” TVA said in a statement.

Bull Run Fossil Plant in Claxton was retired in 2023 to make way for TVA’s clean power initiatives.

Up next

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in